Skip to content
HNYZ Group logo
Multi-Storey Pig Houses for a pig farm

Pig House Construction · B04

Multi-Storey Pig Houses

Stacked production floors that save land where land is scarce or expensive.

  • Much smaller land footprint per pig place
  • Central biosecurity and pig movement design
  • Structure, air and manure planned as one system

Sizes and configuration are customised to the project; details are agreed with you before quotation.

Overview

Multi-storey pig houses place production stages on several floors, linked by ramps or lifts and a central biosecurity design. Capital cost per pig place is higher than for single-storey houses, but the land needed is much smaller, which can make sense where land is limited. Structure, ventilation, manure handling and pig movement need to be planned together from the start.

Features

  1. 01

    Less land

    Production stages are stacked, so each pig place needs much less ground area.

  2. 02

    Central biosecurity

    One entrance, clear clean and dirty flows and short, controlled pig movement.

  3. 03

    One integrated design

    Structure, ventilation, manure and pig movement are planned as one system.

Specifications

Typical reference values. Final dimensions, materials and configuration are customised to your project and confirmed with you before quotation.

Multi-Storey Pig Houses: Specifications
CharacteristicDescription
FloorsTwo or more, set by land and herd size
Pig movementRamps or lifts
StructureReinforced concrete and steel, per local code
VentilationDesigned per floor
ManureCollected by floor and treated centrally
CustomisationYes. Sizes, materials and configuration are adapted to the project.
InstallationSupported by HNYZ installation teams; scope agreed per project.
Packing and transportPacked for sea or road shipping; method agreed per order.
WarrantyAgreed per project.
CertificatesPlease ask for the documents required in your market.

Where it is used

  • Areas where land is scarce or expensive
  • Large sow farms that want a compact site
  • Projects with strict biosecurity plans

Why HNYZ Group

One company for planning, supply and installation, so the equipment fits the rest of the farm.

50
Installation teams
3,000
Completed projects
50+
Countries served

Service

Pre-sales

  • Requirement analysis
  • Layout and equipment list
  • Quotation agreed in detail

Installation

  • Installation by HNYZ installation teams
  • Commissioning and testing
  • Staff training

After-sales

  • Spare parts list with the order
  • Technical support
  • Support for expansion

Frequently asked questions

Is a multi-storey house more expensive?

The cost per pig place is usually higher than for single-storey houses, while the land needed is much smaller. We compare both options for your site.

How do pigs move between floors?

By ramps or lifts, planned together with the biosecurity flow. We agree the system with you at design stage.

Do you supply the building as well as the equipment?

Yes. Building and equipment can come from one supplier, which keeps drawings, interfaces and delivery dates under one responsible party. You can also buy only the part you need.

How is the house size decided?

From the number of pig places, the pen layout and the feeding and ventilation systems. Tell us the herd size and site, and we propose a width, length and eave height.

Can the design follow local building codes?

The structure is calculated for the wind, snow and other loads you give us. Please send the local requirements early so they can be built into the design.

Do you handle the civil works as well?

Civil works and steel-structure houses are part of a turnkey project. The scope for each project is agreed in the contract.

Can the house be built in stages?

Yes. We can plan the master layout for the full farm and build it in phases, so that later houses fit the first ones.

Are sizes and configurations fixed?

No. Dimensions, materials and configuration are customised to your herd size, climate and local rules, and agreed with you before quotation.

Are the specifications on your product pages final?

They are typical reference values to help you compare. Final specifications are confirmed with you before quotation.

Who installs the equipment?

Our installation teams install and commission the equipment. The scope for each project is agreed in the contract.

What warranty do you give?

Warranty terms depend on the equipment and are agreed per project in the contract.

All frequently asked questions →

Enquiry

Ask about this product

Send us your herd size, site and timeline. We reply with a recommended configuration and a quotation.

What happens next

  1. 1

    You send your project details

    Herd size, site, land and target start date. Rough numbers are enough.

  2. 2

    We reply with a layout and an equipment list

    Our team reviews your requirements and proposes a configuration.

  3. 3

    We agree the details with you

    Sizes, materials and scope are confirmed before any quotation.

50
Installation teams
3,000
Completed projects
50+
Countries served
  • Email: sales@hnyzgroup.com
  • +86 185 3894 3078
  • Jiaozuo City, Henan Province, China
  • Founded in 2005 · 300 employees
  • Factory visits welcome: contact us to arrange

Send your inquiry

Your details are used only to answer your inquiry — see our Privacy Policy.

More in Pig House Construction

Request a Quote